Last 03/08/15
Guitar Build Diary for:
Miguel Elizondo
Model: H1a 1937 Segovia/Hauser
Specifications:
| Fitting the coverd vee head joint. | |
| Detailing the head. | |
| Front view. | |
| Back view. | |
| Gluing back braces. | |
| Back complete. | |
| Gluing tail block to soundboard and sides. Neck attached to soundboard. | |
| Soaking back linings before bending. | |
| Tentalones glued to attach sides to the top. | |
| Ready for back lining. | |
| Dedication to Miguel Elizondo prior to gluing the back on. | |
| Gluing the back on. | |
| Top binding and purfling channels cut. | |
| Fingerboard glued on. | |
| Final sanding. Preparing for finishing. | |
| Making the bridge. | |
| Bridge | |
| Bridge | |
| Preparing to pin the bridge. | |
| Pinning the bridge in position. | |
| Locating pins in the bridge and locating holes in soundboard. | |
| Finishing the bridge. | |
| First coat of finish on the neck and body. | |
| Final coats of finish applied. | |
| Last coat of finish. Time for curing stage. | |
| Gluing the bridge! | |
| Final session of French polish to the soundboard.Waiting to buff out finish. | |
| Buffed out and ready for set-up. | |
| V-joint. | |
| Strung up and ready to ship out! | |
| Back. | |
| Strings on and set-up. Preparing to ship out! | |

